- Concreting of factory slab
- Concreting pouring
What are concrete pouring mean? To place a fresh concrete from truck or mixer using a various method to the structural element like slab,beam and so ever.
First of all that is a tradisional method using a wheel barrow or dumper truck or bobcat now collect a fresh concrete from mixer to the place of concrete and by using a scop to fill the concrete to the footing,beam and so on
This type of pouring are suitable for small project whereby ingnore about quality.Ftom mixed of concrete until pouring of concrete too difficult to control the quality.To control the mixed procedure using a box snd then tranfer it to the placing take a long time to finish the job at the day and also the workers not a robot can doing a job at same quality and msybe morning can get grade 25 of concrete but afternoon the grade down to grade 15.
This type of pouring still usef for small project not a structure one like base og fence pole,fence beam and a small building like a huts and project not concern about quality.
The second method poured used a crane with bucket.The fresh concrete from the ready mix truck pour to the bucket and using a crane to transfer the fresh concrete to the place.This the faster way right now.'But this mehod have a limit depending on the height of the building and distance from between the structure and the truck or mixer.The mobile crane also have a size between 20 T and 40 T depending on the height of the building.
Right now tall crane are used for high building to transfer and pour the fresh concrete.The bucket also have a size from 1/2 mcu to 1 meter cube.Its depend how big the structure.Normally a site ready mix or imported ready ready are used and this type of pouring more faster snd cheaper and also the quality is there.
The third method of pouring is using a pipe boom and concrete pump to transfer and pouring if the fresh concrete.Normally fresh concrete from the truck pour to the concrete pump and pumping through the pipe until to the structure.This type of pouring suitable for condition that trucks cant go near to structure may be no road or have an obtruction like many building before and then far the way from the truck place.
Author have an experience supervised pouring concrete using a boom with concrete pump.Concreting for spill way structure at Batu Dam whick trucks cant go near the structure coz the terrain condition.The most important thing to make sure that the mixed not to dry and can stuck inside the pipe.The stuck concrete can make a concrete pump jamned.To released have to detect which point stucked and dismantle the pipe and then pump the stuck concrete out before continuing concreting and this type of pouring maybe costly and not suitable for small project.
Pouring have a quality aspect to control it are the height of pouring to the element.To avoid segigration the height between the start point of pour to the final point of pour not more than 4 feet.The second is the pattern of pour like a slab pour that the pouring system must easy to vibrate that not too thick and not too thin to avoid honeycom.
- Making a cube concrete
- Supervising a rebound test concrete
- Calculation a mix concrete with a volume method
- Curing a cast concrete at the past time
- How to honey comb column,bulging beam.
- Footing without form work
Column is the superstructure element in building.The function of column is to tranfer all the dead load and live load from wall 1st floor slab.There are 2 type of column short column and slender column .Many shape of column such as rectangular,circle ,L shape to the odd like oval and etcs.
How to cast and erect it,?Works involve to make a column is
1.setting out
- Normally they are using a tradisional method,using tape and string and marktaw to the slab.the alignment always to be check whether the grid is out in centre or in
2.rebar
- Rebar installation is very easy.the prefabricated rebar is lifted and fixed to the position.the bottom lapping always to be check.the 25mm concrete cover must be fixed around link and through the height of column.the re bar of column consist of 4 or more main bar and a number of link from bottom to top.
3.formwork
- Formwork erection using plumbob as tradisional method to get the straight verticality or theodalite as modern equipment.then the formwork will strut in 4 or 2 direction to firm or lock it into position.last time the hole at 4 ft interval in height will do for concreting purpose to avoid seggration and then to avoid honey com at the bottom of the column especially for small size of column.
4.concrete
- actually the best way for laying a concrete is using a chute to avoid seggration but not practise for small project.they just pour from the top using bucket and vibrate or hit the formwork to compact it.the site of vibrator also must be small for small size of column.
5.formwork dismantle
- after one day cast,the formwork can dismantle using a right tool and equipment.always check the hney com,if worse,the colum must demolish to make anew one and if less just cover with cement grout.
Maybe 1st or world record that 10 storey building can completed in 28 hours time.The 10 storey apartment using a modular unit system like a lego system using a several unit of mobile crane completed with fully furnish unit apartment in less than one day.
What a modular unit system?.The modular units are prepare in the factory and each unit will assemble storey by storey at the site until completed.The modular unit consists a several unit of room and the sizing of modular unit are loooklike a 40 footer cabin which easy to load and unload a unit for assembling purpose.
Each modular completed with ceiling,partition,wall and slab and completed with finishing like tiles terrazo and so on and also completed with hidden electrical wiring and plumbing and also completed with painting.So the modular unit was completed in the factory snd cart by a long vehicle to the site.At the site the foundation was ready and all the connection using high grade stainless steel bolt amd nut and also all the frame for modular unit are from stainless steel which stronger than a normally mild steel.
But the 28 hours are not include the preparation of a sub structure work.Building more than 2 storey always need piling for their foundation.And depending on the type of pile,the duration to complete the piling work are 1 or 2 weeks time.So maybe the 28 hours are not include sub structure and testing and commisioning works.
For the super structure works using modular unit the 28 hours time to complete 10 storey building are the world record so far but also the design must limited to 10 floor only or limited wind speed and also limited to a specific earthquake movement but also what code of practise for this kind of building to follow.Actually to built these type of building outside from that country are impossible coz no code of practise to follow or any guidance to design and contruct.
May be future in several of years the code of practise are ready and all the country all over the world can built these type of building as many as they can.Why not,fastest and cheapest!
Thank to the technology and continues innovation in civil and structural engineering and more and more new innovation coming in future to pushing the limit of our thinking.
Safety factor for concrete work:
Yesterday at Ipoh,a mandur calling for a senior supevisor died when falling down from 2 meter high.The incident not in the building .The 58 year old mandur died during checking a concrete quality(maybe) but suddenly fell down from the concrete truck mixer and died according worse injured at head.
- Identify the hazard such as accident,chemical attack and etcs
- Decide who might be harm and how
- Evaluate the risks and decide precautions
- Record the finding and implement them
- Review and update the assessment
- The common hazard is slips,trips and fall from the trucks platform(only these kind of hazard will discuss,there are many including chemical and body posture and etcs)
- 50% injuries are from these hazard
- Slippery surface,unsure footing,damage ladder and walkways and unsure hand and foothold during climb and desceding truck cab and platform
Very interesting, I want to see a lot more. Thank you for sharing your information!
ReplyDeleteconcrete repair,concrete restoration companies,concrete restoration services,concrete work,
Thank you for this very helpful article. We are a ready mix concrete supplier company ourselves and we strive to formulate better mixing methods for better concrete.
ReplyDeleteThis is a very informative blog that you have posted. If you are looking for a retaining walls and concrete repair Service in USA. Great Western Corporation is the best company for you, They are provide cathodic protection, retaining walls, and more services.
ReplyDeleteJ&K Cement Corporation is a leading company in the Cement Manufacturing industry for the last 25 years in North India. With 25+ years of experience, we are manufacturing High-Quality PPC and OPC Cement on the values of quality, trust, and transparency.
ReplyDelete