  • bakau and timber pile not longer used in construction
  • A-frame for driving for the above pile change their function
  • chain-survey not longer used as survey instrument
  • hose water level also obsolete
  • cangkul,pongkies  not used for digging process
  • ex met wire still until now for brickwall work
  • fish tail not longer used for timber frame connect to brickwall
  • asbestos ceiling ban in construction
  • timber truss not popular now
  • dead weight roller now as a tukun
  • earthenware pipe for sanitary used not longer used
  • cast iron vent pipe also too brittle for used
  • dpc mat still used until now
  • for JKR project
    • minimum size of pile 175 mm x 175 mm
    • minimum size of beam and column 200 mm
    • minimum size of link R 10
  • wet concrete take 5 hours to have their own weight
  • concrete cover still used until now
  • clay tiles and concrete have different dimension between battern
  • minimum thickness of C channel for industrial truss is 1.0 mm
  • compaction and consolidation have different meaning
  • bored piles and cassion pile are the same thing
  • miropiles,pinpiles,skrew piles are the same thing
  • concrete dumper not used as a concrete transport
  • kickers under timber frame are forgotten now
  • -ditto- means same as above
  • concrete septic tank ban by SPAN
  • mild steel bar not used as a main bar now
  • plumbob not longer used to get centre point
  • formula 3-4-5 to check the accuracy of 90 degree angle are forgotten
  • slope more than 25 degree classify as class IV and V 
  • river in the class IV and V are danger for drinking used